Compare the highest-rated home solar professionals in Miami, Florida. All contractors are licensed, insured, and verified through our rigorous screening process.
A leading, locally-owned and operated solar installer with a strong focus on the South Florida market. They are known for their personalized customer service, in-house installation teams, and deep expertise in navigating local building codes and hurricane-related structural requirements. They offer comprehensive services from design to maintenance.
Sunburst Solar has built a strong reputation in South Florida for high-quality installations and robust customer education. They are a Premier Partner with SunPower, giving them access to some of the highest-efficiency panels on the market. They excel at custom system design for both grid-tied and hybrid (battery-ready) solutions.
This company is one of the longer-standing solar specialists in the region. They offer a wide array of services beyond just installation, including dedicated maintenance, repair, and cleaning plans. They are particularly strong in conducting detailed energy efficiency assessments to ensure the solar system is perfectly sized for the home's consumption.
** The home solar market in Miami is **highly competitive and mature**, driven by abundant sunshine, high electricity costs from Florida Power & Light (FPL), and a population increasingly focused on resilience against power outages (e.g., from hurricanes). The average quality of providers is good, but consumers must be diligent as the market also attracts less reputable sales-focused outfits. **Competition Level:** High. Numerous local and national companies compete, leading to aggressive marketing and a wide range of financing options. **Typical Pricing:** The gross cost for a residential system typically ranges from **$20,000 to $45,000+** before incentives. The final cost is highly dependent on system size (kW), panel quality, and the inclusion of battery storage. The 30% Federal Investment Tax Credit (ITC) significantly reduces the net cost. Most reputable companies offer $0-down loan and lease options, making solar more accessible. **Key Differentiators:** In Miami, expertise in local permitting, hurricane code compliance (including mounting systems rated for high winds), and knowledge of FPL's net metering policies are critical differentiators between top-tier local installers and others. The integration of battery storage (like Tesla Powerwall or Generac PWRcell) is becoming a standard offering for backup power, moving beyond a niche product.
4.7+ star average from verified customer reviews
All contractors are properly licensed and insured
10+ years average experience in the industry
Familiar with Miami regulations and climate
Get answers to common questions about home solar services in Miami, Florida.
In Miami, a typical residential solar system costs between $15,000 and $30,000 before incentives, depending on system size and home energy needs. Crucially, Florida homeowners benefit from the federal solar tax credit (26% in 2023) and the state's sales and property tax exemptions for solar equipment. Unlike some states, Florida does not have a state-level tax credit, but the combination of strong sunshine and no state income tax makes the financial return very attractive.
Solar panels installed in Miami must comply with Florida's strict building codes, which require systems to withstand winds up to 160 mph or more, equivalent to a Category 5 hurricane. Reputable local installers use engineered racking systems and proper mounting to meet these standards. While panels are highly durable, it's essential to review your homeowner's insurance policy to ensure your system is covered for storm-related damage.
Miami-Dade County falls under Florida Power & Light (FPL), which offers a net metering program. You earn bill credits for excess solar energy sent back to the grid, which can offset energy drawn at night or on cloudy days. However, it's important to note that Florida's net metering rules changed in 2022; new systems receive a less favorable "avoided cost" rate for excess generation, making system sizing and potential battery storage more critical for maximizing savings.
From contract to activation, the process typically takes 3 to 6 months in Miami. This timeline includes system design, securing permits from Miami-Dade County (which can be slower than other municipalities), FPL's interconnection application review, installation, and final inspections. The sunny weather allows for flexible installation scheduling, but bureaucratic steps are the primary variable, so choosing an experienced local installer familiar with county processes is key.
Prioritize providers with extensive local experience, proper Florida licensing (Electrical Contractor or Solar Contractor license), and strong knowledge of Miami-Dade County's specific permitting and inspection protocols. Ask for references from nearby installations and verify they handle the entire process, including FPL interconnection. Given the climate, ensure they offer robust workmanship and production warranties to protect your investment from heat and humidity.